Saturday, October 10, 2009

Possible Slab date?

I ran into AE this morning. He was onsite retrieving some equipment, so we had a bit of a chat. He said he has booked the slab pour for the last week in October. He was thinking about a week earlier, but didn't trust the weather. I still don't trust the weather, but we'll cross our fingers, toes and what ever else we can!!


Meanwhile, here's a pic of the view from the kitchen. There will be windows above the beam as well, so we'll see most of this while standing at the (future) kitchen sink. Soooo much nicer than the neighbour's brick wall we look at now!

Slab Insulation

Well the insulation arrived sometime last week and builders got to spend a bit of time out of the wet weather and in the workshop cutting up the insulation. Tom spoke to AE who said that we need about 2 weeks fine weather so they can do the slab as apparently the insulation can absorb water and the if the slab gets water on it, it can lead to some discolouration. The BOM have predicted 20+ days of rain for October, so we figured that we'll never get a slab.

So we were quite surprised when we went up to the house at the beginning of the week to find that they had started installing the insulation. They finished it Thursday, and you can see the sort of weather they had to work through. Not only was it wet, but for most of the day they would have been lucky if it got to double figures!!! I'm amazed at the weather these guys will work in. And as much as the weather is frustrating for us...at least we don't have to work out in it.




Not sure what the time frame for the slab is from here...but between the weather and waiting for the concretor to fit us in...well I won't hold my breath.

Friday, October 9, 2009

Slab Postponed again!!!

25th September
Well this time it's the slab insulation we are waiting on...apparently there's a three week wait on this (it has to come from Adelaide). So to keep themselves busy, AE has decided to continue on with the frame for the timber deck which wraps around the north eastern side of the house.

Deck frame from driveway.

Looking down from beind the house to give a better idea of the shape of the deck. They have also started some of the frames for the windows/doors between the house and the deck.

And from the east
Our front entrance. The frame shown here is for the portico, which is meant to be glass. The front hallway leads to the stairs to the first floor and so will be a void. Above the portico, on the first floor, will be a large inclined window, between the columns shown here. Should look pretty special once it's done. We were a little unsure about the glass portico, as I really don't want to have to clean it all the time...but looking at this now, I think it would look strange if it was solid.